Tertiary filtration that reaches membrane-grade turbidity, without a backwash system.
Reuse permits and tighter TSS and phosphorus limits push treatment plants past sand and cloth filters to a membrane barrier. Scrub UF puts flat-sheet ultrafiltration in an open tank after the clarifier. Media scrubs the sheets while they run, so there is no backwash pump, tank or cycle.

The problem
Why tertiary filtration for reuse projects stall.
“Our reuse permit wants membrane-grade water.”
Some reuse rules, for example, require membrane filtrate at or below 0.2 NTU more than 95% of the time and never above 0.5 NTU, continuously monitored. Scrub UF permeate is typically below 1 NTU and often below 0.1 NTU. We do not claim state acceptance on this page.
“Backwash systems are the part that breaks.”
Pressurized and hollow-fiber UF need backwash pumps, tanks, valves and sequencing. Scrub UF has none of that.
“Coagulant dose keeps creeping up.”
Conventional tertiary trains dose coagulant that changes with the water and makes chemical sludge. Scrub UF often runs without coagulant. Phosphorus limits may still call for one.
“We need more capacity in the same footprint.”
Submerged flat sheets go into existing or new tankage, and units are added as flow grows.
Where Scrub UF fits
Typical trains.
| Goal | Example train |
|---|---|
| Lower TSS for reuse or discharge | Final clarifier → Scrub UF → disinfection |
| Lower total phosphorus | Final clarifier → coagulant dose → Scrub UF |
| Reuse with a dissolved-solids spec | Final clarifier → Scrub UF → NF or RO → reuse |
| Lower COD | Final clarifier → Scrub UF → ozone or advanced oxidation |
At a glance
What the membrane does.
| Item | Scrub UF (typical) |
|---|---|
| Membrane | PVDF thin-film composite flat-sheet ultrafiltration, on PET non-woven with a PP filtrate channel, about 0.04 µm nominal pore size. Same membrane family as Swing; the difference is mechanical scrubbing rather than swing/scour cleaning |
| Fouling control | Circulating scrubbing media wipes the sheets while they run. No backwash pump, tank or cycle |
| Design flux | 9–12 GFD (15–20 LMH); peak 15 GFD (25 LMH) |
| Permeate | Turbidity typically below 1 NTU, often below 0.1 NTU; SDI typically below 4 |
| Recovery | 90% or better, depending on feed and concentrate handling |
| Chemical clean | Often every few weeks to about 1–2 months on suitable feeds |
Typical values from reference installations, test data and design studies. Your proposal sets the design point and any guaranteed values for your water.
Projects like these
Reference results on similar water.
From reference installations, tests and design studies. Names and sites are withheld. Results on other water will differ, and we confirm by pilot.
Design study, low-solids process water
One engineering design study, about 264,000 gpd (1,000 m³/d) of pretreated low-solids industrial water: specific energy about 0.5 kWh/kgal (0.13 kWh/m³) for Scrub UF versus about 1.4 kWh/kgal (0.36 kWh/m³) for pressurized UF. Not a guarantee. Chemical cleaning about every 1–2 months versus about every 7 days in that study.
Storm water to RO
Feed TSS 15–100 mg/L, filtrate below 5 mg/L, with about one-third of the solid waste of a coagulation train.
Hollow-fiber comparison
Reference data: Scrub tolerated about 200 mg/L feed TSS vs about 100 mg/L for submerged hollow fiber.
Packaged units
Sizes from 861 to 11,300 ft² (80 to 1,050 m²).
| Model | Membrane area | Design permeate* |
|---|---|---|
| Scrub-UF80 | 861 ft² (80 m²) | 5–7 gpm · 7,800–10,300 gpd (29–38 m³/d) |
| Scrub-UF260-1 | 2,800 ft² (260 m²) | 17–23 gpm · 25,200–33,600 gpd (94–125 m³/d) |
| Scrub-UF350-1 | 3,770 ft² (350 m²) | 24–31 gpm · 33,900–45,200 gpd (126–168 m³/d) |
| Scrub-UF260-2 | 5,600 ft² (520 m²) | 35–47 gpm · 50,400–67,200 gpd (187–250 m³/d) |
| Scrub-UF350-3 | 11,300 ft² (1,050 m²) | 71–94 gpm · 101,700–135,600 gpd (378–504 m³/d) |
*Design permeate at 9–12 GFD (15–20 LMH), peak 15 GFD (25 LMH). Larger plants use multiple units or a multi-cell tank, confirmed per project. Units are assembled in Poughkeepsie, NY.
Try it first: the Scrub-UF80 ships as a unit to buy or rent for a pilot on your own water. Rentals
Honest selection
What UF will and won’t do here.
Scrub UF is a filtration step, not biological treatment. For BOD and nitrogen removal start with an MBR (Swing or Palisade). Reuse approvals are state-specific, and no state reuse approval is claimed on this page. We review the requirements with you per project.
What to send
Water first.
- Plant flow, average and peak
- Clarifier effluent TSS, turbidity, TP
- Reuse or discharge permit limits
- Existing tankage and filter footprint
- Disinfection and any RO downstream
Related
UF for industrial water reuse · UF for RO pretreatment · Scrub UF product page
We presently have a manufacturing facility in Poughkeepsie, New York, and the ability to ship from Europe and Asia.
Warranty against defects in materials and workmanship. For industrial applications, membrane life depends on the service duty, so we run a pilot test to establish expected system life.