Home / Products / Scrub UF

Packaged ultrafiltration · No backwash · Often no coagulant

Scrub UF: ultrafiltration that keeps scrubbing itself clean.

Flat-sheet UF in an open tank, with scrubbing media that continuously wipes fouling off the membrane while it runs. In many cases the pretreatment ahead of it is a fine screen, so the train can be shorter than coagulation, clarification and media filters, with no backwash pump and no backwash tank.

What we do in Poughkeepsie: Assembled in Poughkeepsie, NY. In our Poughkeepsie shop we build frames and assemble units.

Scrub UF cassette in an open tank

At a glance

What Scrub UF is built to do.

ItemScrub UF (typical)
MembraneFlat-sheet PES UF, hydrophilic, about 0.04 µm nominal pore size
FiltrationSubmerged, low-pressure suction from an open tank
Fouling controlCirculating scrubbing media wipes the sheet surface while the unit runs. Screens keep the media in the unit
BackwashNone
PretreatmentOften a fine screen only. Depends on the feed
Design flux9–12 GFD (15–20 LMH); peak 15 GFD (25 LMH). May run higher on clean water
Permeate qualityTurbidity typically below 1 NTU and often below 0.1 NTU. SDI typically below 4, suitable as RO feed in many cases
Recovery90% or better, depending on feed and how concentrate is discharged
Chemical clean (CIP)Often every few weeks to about 1–2 months on suitable feeds. Many pressurized UF systems are cleaned about weekly
Membrane lifeReference data often plan on 5+ years. Life depends on the feed, flux and cleaning
ControlAutomated, with remote monitoring available

Typical values from reference installations, test data and design studies. Your proposal sets the design point and any guaranteed values for your feed.

Stack of flat-sheet UF membranes
Flat-sheet UF. Open sheets, rather than a fiber bundle.
Diagram of scrubbing media moving across a flat sheet
Scrubbing media circulates across the sheet and is held in the tank by a screen.

One design study

A shorter process than the usual UF trains.

ItemScrub UF (submerged flat sheet)Submerged hollow fiberPressurized UF
Pretreatment in the studyFine screenFine screenCoagulation, flocculation, sand filter and screen
Flux in the studyAbout 33 GFD (56 LMH)About 24 GFD (40 LMH)About 31 GFD (53 LMH)
Membrane area for the same dutyLowest in the studyHighest in the studySimilar to Scrub UF in the study
BackwashNoneYesYes, with a dedicated pump
Chemical cleanAbout every 1–2 monthsDaily maintenance clean plus monthly CIPAbout every 7 days
Specific energy in the studyAbout 0.5 kWh/kgal (0.13 kWh/m³)About 0.6 kWh/kgal (0.15 kWh/m³)About 1.4 kWh/kgal (0.36 kWh/m³)
Coagulant and chemical sludgeNone in the study caseDepends on designCoagulant required; produces sludge
Membrane life in the study5+ years3+ years3+ years

From one engineering design study for about 264,000 gpd (1,000 m³/d) of pretreated, low-solids industrial water. Results on other feeds will differ. Our proposals use 9–12 GFD (15–20 LMH), peak 15 GFD (25 LMH), unless pilot data supports more. May run higher on clean water. Hollow fiber can be the better choice on some very difficult feeds, so we size each job on its own water.

Specific energy from one design study, Scrub UF compared with hollow fiber and pressurized UF
Specific energy in one design study, 264,000 gpd (1,000 m³/d). Not a guarantee.
Scrub UF compared with submerged hollow fiber in one reference comparison
One reference comparison. Feed-dependent; we confirm by pilot.

Where it fits

Applications

DutyWhat Scrub UF is asked to doWhat to plan for
RO pretreatmentStorm water and surface water to RO, often after a fine screen, instead of coagulation, clarification and media filtersTypical permeate SDI below 4. In one storm-water reference case, solid waste was about 2.8 versus 8.3 US tons/month
Industrial water reuseTextile and denim wash water, cooling water and process water, ahead of NF or RO where the reuse spec needs itUF removes particulate and colloidal color, not all dissolved color. Plan ozone, GAC or NF where the color limit is tight
Surface and spring waterDirect filtration of surface, spring or groundwater, in many cases without flocculantOne spring-water case: 11–40 NTU raw to permeate below 0.3 NTU. Potable use must meet state and federal requirements; certification is reviewed per project

UF only

Scrub is a UF platform, not an MBR biomass platform. For biological treatment, start with Swing or Palisade.

Packaged or multi-cell

Independent packaged units for small plants or tight access. A multi-cell tank, with one cell offline while the others produce, is confirmed per project.

Try it first

The Scrub-UF80, 861 ft² (80 m²), ships as a packaged unit to buy or rent for a pilot.

Selected units

From 861 ft² (80 m²) to 11,300 ft² (1,050 m²).

ModelMembrane areaL × W × HDesign permeate*
Scrub-UF80861 ft² (80 m²)3'-3" × 3'-3" × 5'-11"
(1,000 × 1,000 × 1,800 mm)
5–7 gpm
7,800–10,300 gpd (29–38 m³/d)
Scrub-UF260-12,800 ft² (260 m²)3'-11" × 7'-3" × 7'-5"
(1,200 × 2,200 × 2,250 mm)
17–23 gpm
25,200–33,600 gpd (94–125 m³/d)
Scrub-UF350-13,770 ft² (350 m²)3'-11" × 7'-3" × 8'-4"
(1,200 × 2,200 × 2,530 mm)
24–31 gpm
33,900–45,200 gpd (126–168 m³/d)
Scrub-UF260-25,600 ft² (520 m²)7'-7" × 7'-3" × 7'-5"
(2,300 × 2,200 × 2,250 mm)
35–47 gpm
50,400–67,200 gpd (187–250 m³/d)
Scrub-UF350-311,300 ft² (1,050 m²)11'-0" × 7'-3" × 8'-4"
(3,350 × 2,200 × 2,530 mm)
71–94 gpm
101,700–135,600 gpd (378–504 m³/d)

*Design permeate at 9–12 GFD (15–20 LMH), peak 15 GFD (25 LMH). May run higher on clean water; we confirm that by pilot or reference data before we design to it. Septic and low-oversight duty, where an MBR is the right tool, is 6 GFD (10 LMH) or less. A 0.16 in (4.0 mm) sheet family is also available (Scrub-UF210 / UF280).

Permeate by model at design flux and a higher clean-water guidance band
Design permeate at 9–12 GFD (15–20 LMH). The upper band is clean-water guidance and may run higher. It is not the design point.

Larger plants can use a multi-cell tank, with each cell taken offline for cleaning while the others keep producing. Configuration is confirmed per project. Units are assembled in Poughkeepsie, NY.

Scrub UF unit outline drawing
Unit outline. Certified project drawings come with the quotation.

Catalog, cut sheets and downloads

  • Scrub UF catalog, Rev03
    PDF · Nov 2026
    PDF
  • Scrub UF data sheet
    PDF
    PDF
  • Scrub-UF80 cut sheet
    PDF · Oct 2026
    PDF
  • Scrub-UF260-1 cut sheet
    PDF · Oct 2026
    PDF
  • Scrub-UF260-2 cut sheet
    PDF · Oct 2026
    PDF
  • Scrub-UF350-1 cut sheet
    PDF · Oct 2026
    PDF
  • Scrub-UF350-3 cut sheet
    PDF · Oct 2026
    PDF

All resources →

Questions

Common questions

What flux do you design to?

9–12 GFD (15–20 LMH), with 15 GFD (25 LMH) for short peaks. May run higher on clean water. We confirm a higher flux by pilot or reference data before we design to it.

How is it cleaned without backwash?

Screen-retained scrubbing media circulates in the tank and wipes the fouling layer off the sheets while they run. A periodic tank drain removes solids, and a chemical soak is done every few weeks to months on suitable feeds.

Will UF remove color?

Partly. UF removes particulate and colloidal color. Dissolved dye usually needs a polishing step after UF, such as ozone, GAC or NF. We do not promise full color removal.

Is Scrub UF an MBR?

No. Scrub is a UF platform. For biological treatment with membranes, see Swing MBR or Palisade, or the MBR overview.

Is the integrated tank a standard product?

A multi-cell tank can be part of a larger plant. The configuration is confirmed per project.

UF duty outside an MBR?

Send us your feed water data. We will size Scrub UF from 861 to 11,300 ft² (80 to 1,050 m²), or set up a Scrub-UF80 pilot.